 Before                       After                                      Repair Description                         Date Completed         Details
Wall before carbon fiber. After Fortress carbon fiber installation Cordova, TN - Full twelve foot basement had vertical cracks in the CMU block since new. Fortress carbon fiber strips were installed to strenghten the wall and allow the owner to remove the timber braces supporting the wall.
10/30/2008

Trenton, TN - Dr. T.K. Happel had the gazebo constructed in 1896, for his wife and her friends to have a shady place to rest when taking their Sunday afternoon strolls.

10/03/2008
Mid Town home before stabilization Mid town home after stabilization Memphis, TN - Termites damaged joists causing load bearing wall to bear down on floor resulting in 1" drop in floor. Treated timber was added to support this load bearing wall and prevent further settlement.
8/13/2008
 
Lexington, TN. pile installation Lexington, TN. pile installation Lexington, TN - This beautiful two story home with 2 large fireplaces, needed stabilzation. We installed approximately 20 Ram Jack helical piles. The back patio was was removed, in doing so we found the blocks were deteriorating. We poured a new footer and core filled the foundation walls & fireplace.
2/27/2004
Historic White Plantation Home. Historic White Plantation Home Paris, TN - Mr. Eddie Bolton replaced beams damaged by termites and level and stabilized hardwood floors and also replaced beams, sills and floor joists. Major damage was caused by termites.
5/1992